<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Traffic Archives - City of North Little Rock</title>
	<atom:link href="https://nlr.ar.gov/tag/traffic/feed/" rel="self" type="application/rss+xml" />
	<link>https://nlr.ar.gov/tag/traffic/</link>
	<description></description>
	<lastBuildDate>Fri, 01 Nov 2024 17:29:52 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.2</generator>

<image>
	<url>https://nlr.ar.gov/wp-content/uploads/2022/11/nlr-white-simple@3x-150x150.png</url>
	<title>Traffic Archives - City of North Little Rock</title>
	<link>https://nlr.ar.gov/tag/traffic/</link>
	<width>32</width>
	<height>32</height>
</image> 
<site xmlns="com-wordpress:feed-additions:1">252392246</site>	<item>
		<title>Road Construction and Traffic Updates</title>
		<link>https://nlr.ar.gov/2023/04/01/road-construction-and-traffic-updates/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=road-construction-and-traffic-updates</link>
		
		<dc:creator><![CDATA[Alison]]></dc:creator>
		<pubDate>Sat, 01 Apr 2023 13:09:00 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[Traffic]]></category>
		<guid isPermaLink="false">https://nlr.ar.gov/?p=5591</guid>

					<description><![CDATA[<p>UpdatedNovember 1 UpdatedDecember 14, 2023 Jacksonville Update March 25 Traffic will be controlled by construction barrels and signage. Drivers should exercise caution when approaching and traveling through all highway work [&#8230;]</p>
<p>The post <a href="https://nlr.ar.gov/2023/04/01/road-construction-and-traffic-updates/">Road Construction and Traffic Updates</a> appeared first on <a href="https://nlr.ar.gov">City of North Little Rock</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="has-text-align-center wp-block-paragraph">Updated on November 1, 2024<br><em>I-30 | NLR Downtown Roads |  I-67/167 Jacksonville</em></p>



<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-33225e43 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image aligncenter size-full"><img decoding="async" width="76" height="76" src="https://nlr.ar.gov/wp-content/uploads/2023/04/I30-Construction-0-jpg.webp" alt="" class="wp-image-5890"/></figure>



<p class="has-text-align-center wp-block-paragraph"><em>Updated</em><br>November 1</p>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image aligncenter size-medium is-resized"><img decoding="async" width="300" height="115" src="https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-300x115.webp" alt="image of two street signs" class="wp-image-8222" srcset="https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-300x115.webp 300w, https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-1024x393.webp 1024w, https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-768x295.webp 768w, https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-1536x590.webp 1536w, https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-2048x786.webp 2048w" sizes="(max-width: 300px) 100vw, 300px" /></figure>



<p class="has-text-align-center wp-block-paragraph"><em>Updated</em><br>December 14, 2023</p>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-image aligncenter size-full"><img decoding="async" width="166" height="67" src="https://nlr.ar.gov/wp-content/uploads/2023/04/Hwy67167.png" alt="" class="wp-image-5886"/></figure>



<p class="has-text-align-center wp-block-paragraph"><strong>Jacksonville</strong></p>



<p class="has-text-align-center wp-block-paragraph">Update March 25</p>
</div>
</div>



<p class="wp-block-paragraph">Traffic will be controlled by construction barrels and signage. Drivers should exercise caution when approaching and traveling through all highway work zones. Additional travel information can be found at&nbsp;<a href="http://idrivearkansas.com" target="_blank" rel="noreferrer noopener">IDriveArkansas.com</a>&nbsp;or&nbsp;<a href="http://www.ardot.gov/" target="_blank" rel="noreferrer noopener">ARDOT.gov</a>. You can also follow us on&nbsp;<a href="https://twitter.com/idrivearkansas" target="_blank" rel="noreferrer noopener">Twitter @IDriveArkansas</a>&nbsp;for traffic and @myARDOT for everything else.</p>



<div class="wp-block-uagb-tabs uagb-block-6c12c52a uagb-tabs__wrap uagb-tabs__hstyle3-desktop uagb-tabs__vstyle6-tablet uagb-tabs__stack1-mobile" data-tab-active="0"><ul class="uagb-tabs__panel uagb-tabs__align-left" role="tablist"><li class="uagb-tab uagb-tabs__active" role="none"><a href="#uagb-tabs__tab0" class="uagb-tabs-list uagb-tabs__icon-position-left" data-tab="0" role="tab"><div>I-30</div></a></li><li class="uagb-tab " role="none"><a href="#uagb-tabs__tab1" class="uagb-tabs-list uagb-tabs__icon-position-left" data-tab="1" role="tab"><div>Downton NLR Streets</div></a></li><li class="uagb-tab " role="none"><a href="#uagb-tabs__tab2" class="uagb-tabs-list uagb-tabs__icon-position-left" data-tab="2" role="tab"><div>Hwy 67/167 &#8211; Jacksonville</div></a></li></ul><div class="uagb-tabs__body-wrap">
<div class="wp-block-uagb-tabs-child uagb-tabs__body-container uagb-inner-tab-0" aria-labelledby="uagb-tabs__tab0">
<figure class="wp-block-image aligncenter size-full is-resized"><img loading="lazy" decoding="async" width="551" height="76" src="https://nlr.ar.gov/wp-content/uploads/2023/01/I30-Construction-jpg.webp" alt="" class="wp-image-333" srcset="https://nlr.ar.gov/wp-content/uploads/2023/01/I30-Construction-jpg.webp 551w, https://nlr.ar.gov/wp-content/uploads/2023/01/I30-Construction-300x41.webp 300w" sizes="auto, (max-width: 551px) 100vw, 551px" /></figure>



<p class="wp-block-paragraph"><strong>New Traffic Pattern and Weekend Detour Scheduled for</strong> <strong>Interstate 30 Eastbound in Little Rock and North Little Rock:</strong></p>



<p class="wp-block-paragraph"><strong>Phase 3 of I-30 Arkansas River Bridge Opening Begins November 1</strong><strong></strong></p>



<p class="wp-block-paragraph"><strong>PULASKI COUNTY | October 31, 2024</strong></p>



<p class="wp-block-paragraph">Opening all lanes on the Interstate 30 (I-30) eastbound Arkansas River bridge will require a detour with traffic impacts over the weekend of November 1-4 in Little Rock and North Little Rock, weather permitting.&nbsp; This is the third and final phased traffic shift planned in order to transition traffic into its final alignment. Eastbound traffic is encouraged to find an alternate route during the duration of the detour.</p>



<p class="wp-block-paragraph">Construction on I-30 will require a closure of all eastbound lanes with detours <strong>from 10 p.m., Friday, November 1 through 5 a.m., Monday, November 4</strong>. This work will not impact I-30 westbound.</p>



<p class="wp-block-paragraph"><strong><u>Phase 3 Weekend Detour</u></strong></p>



<p class="wp-block-paragraph"><strong>The following detour will take place over the weekend of November 1-4:</strong></p>



<ul class="wp-block-list">
<li>I-30 eastbound and I-630 eastbound to I-30 eastbound traffic will be detoured onto the northbound frontage road in Little Rock (Exit 140)</li>



<li>Traffic will continue onto the northbound frontage road and use the 4th Street on-ramp to return to the I-30 eastbound river bridge; I-30 eastbound will be reduced to one lane when crossing the river bridge</li>



<li>Crossing the river, traffic will take the Broadway Street exit (Exit 141) in North Little Rock. The traffic signal at Broadway Street will be modified to allow a free flow of traffic off and on I-30 eastbound; Broadway Street traffic will be detoured to Riverfront Drive and<br>N. Locust Street in North Little Rock</li>



<li>Traffic will continue onto N. Locust Street and take the Bishop Lindsey Avenue on-ramp to return to I-30 eastbound</li>
</ul>



<p class="wp-block-paragraph"><a href="https://nlr.ar.gov/wp-content/uploads/2024/11/NR-24-317-A.pdf">See detour map <strong>NR 24-317-A</strong> for additional information</a></p>



<p class="wp-block-paragraph"><strong>The following new traffic patterns will take place after the weekend of Phase 3:</strong></p>



<ul class="wp-block-list">
<li>There will be a total of six lanes on the I-30 eastbound river bridge</li>



<li><strong>Traffic must decide to exit to Broadway Street BEFORE crossing the river bridge</strong>; to access Broadway Street, traffic will use the right lane; to continue on I-30 eastbound, traffic will use the three left lanes</li>
</ul>



<p class="wp-block-paragraph"><a href="https://nlr.ar.gov/wp-content/uploads/2024/11/NR-24-317-B.pdf">See traffic pattern map <strong>NR-24 317-B</strong> for additional information.</a></p>



<hr class="wp-block-separator has-alpha-channel-opacity"/>



<p class="wp-block-paragraph"><strong>New Traffic Pattern and Weekend Detour Scheduled for</strong> <strong>Interstate 30 Eastbound in Little Rock and North Little Rock:</strong></p>



<p class="wp-block-paragraph"><strong>Phase 3 of I-30 Arkansas River Bridge Opening Begins November 1</strong><strong></strong></p>



<p class="wp-block-paragraph"><strong>PULASKI COUNTY | October 25, 2024</strong></p>



<p class="wp-block-paragraph">Opening all lanes on the Interstate 30 (I-30) eastbound Arkansas River bridge will require a detour with traffic impacts over the weekend of November 1-4 in Little Rock and North Little Rock, weather permitting.&nbsp; This is the third and final phased traffic shift planned in order to transition traffic into its final alignment. Eastbound traffic is encouraged to find an alternate route during the duration of the detour.</p>



<p class="wp-block-paragraph">Construction on I-30 will require a closure of all eastbound lanes with detours <strong>from 10 p.m., Friday, November 1 through 5 a.m., Monday, November 4</strong>. This work will not impact I-30 westbound.</p>



<p class="wp-block-paragraph"><strong><u>Phase 3 Weekend Detour</u></strong></p>



<p class="wp-block-paragraph"><strong>The following detour will take place over the weekend of November 1-4:</strong></p>



<ul class="wp-block-list">
<li>I-30 eastbound and I-630 eastbound to I-30 eastbound traffic will be detoured onto the northbound frontage road in Little Rock (Exit 140)</li>



<li>Traffic will continue onto the northbound frontage road and use the 4th Street on-ramp to return to the I-30 eastbound river bridge; I-30 eastbound will be reduced to one lane when crossing the river bridge</li>



<li>Crossing the river, traffic will take the Broadway Street exit (Exit 141) in North Little Rock. The traffic signal at Broadway Street will be modified to allow a free flow of traffic off and on I-30 eastbound; Broadway Street traffic will be detoured to Riverfront Drive and<br>N. Locust Street in North Little Rock</li>



<li>Traffic will continue onto N. Locust Street and take the Bishop Lindsey Avenue on-ramp to return to I-30 eastbound</li>
</ul>



<p class="wp-block-paragraph"><a href="https://nlr.ar.gov/wp-content/uploads/2024/10/NR-24-316-A.pdf">See detour map <strong>NR 24-316-A</strong></a> for additional information</p>



<p class="wp-block-paragraph"><strong>The following new traffic patterns will take place after the weekend of Phase 3:</strong></p>



<ul class="wp-block-list">
<li>There will be a total of six lanes on the I-30 eastbound river bridge</li>



<li><strong>Traffic must decide to exit to Broadway Street BEFORE crossing the river bridge</strong>; to access Broadway Street, traffic will use the right lane; to continue on I-30 eastbound, traffic will use the three left lanes</li>
</ul>



<p class="wp-block-paragraph"><a href="https://nlr.ar.gov/wp-content/uploads/2024/10/NR-24-316-B.pdf">See traffic pattern map <strong>NR-24 316-B</strong></a> for additional information.</p>



<hr class="wp-block-separator has-alpha-channel-opacity"/>



<hr class="wp-block-separator has-alpha-channel-opacity"/>



<p class="wp-block-paragraph"></p>
</div>



<div class="wp-block-uagb-tabs-child uagb-tabs__body-container uagb-inner-tab-1" aria-labelledby="uagb-tabs__tab1">
<figure class="wp-block-image aligncenter size-medium"><img decoding="async" width="300" height="115" src="https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-300x115.webp" alt="image of two street signs" class="wp-image-8222" srcset="https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-300x115.webp 300w, https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-1024x393.webp 1024w, https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-768x295.webp 768w, https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-1536x590.webp 1536w, https://nlr.ar.gov/wp-content/uploads/2023/07/streetsign-nlr-2048x786.webp 2048w" sizes="(max-width: 300px) 100vw, 300px" /></figure>



<p class="wp-block-paragraph"><strong>Advance Notice</strong></p>



<p class="wp-block-paragraph"><strong>Full Closure of Riverfront Drive Scheduled in North Little Rock</strong></p>



<p class="wp-block-paragraph"><strong>PULASKI COUNTY | December 14, 2023</strong></p>



<p class="wp-block-paragraph">Construction on the new Interstate 30 westbound river bridge in North Little Rock will require a full closure of Riverfront Drive <strong>from 6 a.m. to 6 p.m. Wednesday, December 20.</strong></p>



<p class="wp-block-paragraph">Crews will close Riverfront Drive between Pine and Olive Streets in North Little Rock. Westbound traffic will detour north on Pine Street, west on Broadway Street, and south on Poplar Street. Eastbound traffic will detour north on Poplar Street, east on Broadway Street, and south on Riverfront Drive.</p>



<p class="wp-block-paragraph"><a href="https://nlr.ar.gov/wp-content/uploads/2023/12/NR-23-418-A.pdf">See detour map NR 23-418-A</a> for additional information. Access to the Downtown Riverside RV Park will remain open.</p>
</div>



<div class="wp-block-uagb-tabs-child uagb-tabs__body-container uagb-inner-tab-2" aria-labelledby="uagb-tabs__tab2">
<figure class="wp-block-image size-full"><img decoding="async" width="166" height="67" src="https://nlr.ar.gov/wp-content/uploads/2023/04/Hwy67167.png" alt="" class="wp-image-5886"/></figure>



<p class="wp-block-paragraph"><strong>PULASKI COUNTY | March 25, 2024</strong> (NR 24-089)</p>



<p class="wp-block-paragraph">Highway 67 northbound traffic in Jacksonville will shift onto new pavement overnight from&nbsp;<strong>8 p.m. Wednesday, March 27 through 5 a.m. Thursday, March 28</strong>.</p>



<p class="wp-block-paragraph">Weather permitting, crews will shift Highway 67 northbound traffic between Main Street (Exit 9) and Vandenberg Boulevard (Exit 11A) from the existing main lanes onto new pavement adjacent to the Highway 67 southbound lanes.</p>



<p class="wp-block-paragraph">Highway 67 northbound traffic will periodically be detoured to use the frontage road during any main lane closures required to make the shift. See&nbsp;<a href="https://www.ardot.gov/wp-content/uploads/NR-24-089-A.pdf">detour map&nbsp;<strong>NR 24-089-A</strong></a>&nbsp;for more information.</p>



<p class="wp-block-paragraph"><strong>Highway 67 northbound traffic detour:</strong></p>



<ul class="wp-block-list">
<li>Take Exit 9 (Main Street)</li>



<li>Continue along TP White Drive</li>



<li>Take the Highway 67 on-ramp north of Vandenberg Boulevard</li>
</ul>



<p class="wp-block-paragraph">In addition, the&nbsp;<strong>Highway 67 southbound Exit 9 ramp (Main Street)</strong>&nbsp;will close indefinitely beginning at&nbsp;<strong>8 p.m. Wednesday, March 27.</strong></p>



<p class="wp-block-paragraph">Traffic will use the newly re-opened&nbsp;<strong>Highway 67 southbound Exit 10A (N. James Street)</strong>&nbsp;ramp to access Main Street. See&nbsp;<a href="https://www.ardot.gov/wp-content/uploads/NR-24-089-B.pdf">detour map&nbsp;<strong>NR 24-089-B</strong></a><strong>&nbsp;</strong>for more information.</p>



<p class="wp-block-paragraph">Traffic will be controlled with message boards, traffic drums, and detour signs. The public is advised to be cautious when traveling in the work zone and watch for slower traffic speeds. Areas adjacent to the Interstate may experience noise impacts during nighttime hours.&nbsp;</p>



<p class="wp-block-paragraph">This project (Job CA0604) is part of ARDOT’s Connecting Arkansas Program and includes widening 2.5 miles of Highway 67 to six lanes, between Main Street (Exit 9) and Vandenberg Boulevard (Exit 11) in Jacksonville. The project also includes improvements at the James Street interchange (Exit 10A), the Gregory Street Interchange (Exit 10B), the Vandenberg Boulevard interchange (Exit 11), and conversion of the Frontage roads from two-way to one-way. More information on this $145.2 million project is available at&nbsp;<a href="http://www.connectingarkansasprogram.com/">ConnectingArkansasProgram.com</a>.</p>
</div>
</div></div>



<hr class="wp-block-separator has-alpha-channel-opacity"/>
<p>The post <a href="https://nlr.ar.gov/2023/04/01/road-construction-and-traffic-updates/">Road Construction and Traffic Updates</a> appeared first on <a href="https://nlr.ar.gov">City of North Little Rock</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">5591</post-id>	</item>
	</channel>
</rss>
